London, England

Granny Flat Prices in London

6 services from £4,500

Granny Flat Prices in London

Prices include VAT. Garden annexes typically require planning permission unless they qualify as permitted development. Build times vary from 8–16 weeks depending on size and complexity.

Filter by price range$4,500 – $250,000
$4,500$250,000
ServiceFromAverageUp to

Granny flat prices in London

Granny Flat Tips for London

London garden annexes often require planning permission due to conservation area restrictions — check with your borough early

Access for construction vehicles in London is often challenging — crane costs and skip permits add to the build budget

London annexes command high rental values — a 1-bed can generate £1,200–£1,800/month depending on borough

Modular and prefab annexes are popular in London due to reduced site disruption and faster build times

Popular Options at a Glance — London

1-Bed Granny Flat

£98,000

avg · £72,000£125,000

Complete 40m² build with kitchen & bathroom

2-Bed Granny Flat

£144,000

avg · £108,000£180,000

Full 60m² build with 2 bedrooms

Granny flat prices in London start from £4,500/job. A 1-bedroom granny flat costs £98,000 on average. Prices include VAT. Garden annexes typically require planning permission unless they qualify as permitted development. Build times vary from 8–16 weeks depending on size and complexity.

The best granny flat type depends on your budget, lot size, and intended use. For rental income, a 1-bedroom or 2-bedroom with standard finishes offers the best return on investment. For family use, consider accessibility features and a more generous layout.

A standard granny flat in London takes 12–20 weeks from slab to handover. A 2-bedroom build averages £144,000 and takes 16–20 weeks. Kit/prefab builds can be completed in 8–12 weeks. Council approval adds 2–24 weeks depending on the pathway.

Yes — all granny flats in London require building or planning approval. Your builder or certifier will advise on whether you can use a fast-track approval pathway or need a full development application. The approval process, costs, and timeline vary by council area.