Quick Answer

Concreting in Wellington typically runs from NZ$78 to NZ$800, with a mid-market rate around NZ$102 for concrete driveway work.

Wellington, Wellington Region

Concreting Prices in Wellington

4 services from NZ$78

Prices updated March 2026Based on 4+ quotes

Concreting Prices in Wellington

Prices include GST. Site preparation and access conditions affect final pricing.

Filter by price range$78 – $800
$78$800
ServiceFromAverageUp to

Concreting prices in Wellington

Updated March 20264+ prices tracked

What Affects the Price in Wellington?

Wellington rates are often driven by hillsides, wind exposure, and retaining complexity rather than raw square metre totals.

Retaining, reinforcement, and curing protection need to be explicit in the quote.

Weather exposure can turn a simple slab into a more carefully managed project.

Driveway replacement

Usually includes demolition, spoil removal, base preparation, reinforcement, pour, finishing, and curing advice. Decorative driveways need sealing and more careful timing.

Patio or entertaining slab

Often priced on square metres, but drainage falls, access, and edge detailing can change the total more than customers expect.

Shed base or utility slab

These jobs look simple, but minimum call-out, boxing, and base preparation mean small slabs rarely achieve the cheapest advertised per-square-metre rate.

Retaining or structural work

Engineering, reinforcement, excavation, and compliance quickly dominate cost, so these jobs should never be compared on finish rate alone.

Concreting Tips for Wellington

Wellington hillside sections often need significant retaining walls

Seismic requirements affect structural concrete design

Wind exposure can affect curing — use windbreaks for exposed pours

What Is Usually Included

Concrete supply and placement for the service named in the quote
Standard finish, joints, and residential labour within the agreed scope
Normal site cleanup and basic curing instructions

Common Extras

Demolition and tipping of existing concrete or spoil
Pump hire, difficult access, or extended wheelbarrow runs
Sealing, decorative detailing, drainage work, or engineering

What To Expect Before You Book

Check 1

Confirm slab thickness, reinforcement, and base preparation in writing.

Check 2

Ask who is responsible for demolition, spoil removal, and permits.

Check 3

Check whether the contractor has priced realistic curing and return-visit timing.

Check 4

Compare the warranty and aftercare, not just the pour day price.

Concreting in Wellington starts from NZ$78 per m². A plain concrete slab averages NZ$88 per sqm. Prices include GST. Site preparation and access conditions affect final pricing.

Common finishes in Wellington include plain broom-finished concrete (most affordable), exposed aggregate (decorative with natural stones), coloured concrete (oxide pigments), and stamped or patterned concrete (mimics stone, slate, or tile). Exposed aggregate and stamped finishes are popular for driveways and entertaining areas.

A well-constructed concrete driveway typically lasts 25–50 years with proper maintenance. Regular sealing (every 2–5 years), avoiding heavy point loads, and repairing cracks early all extend the lifespan. Decorative finishes like exposed aggregate require more frequent resealing than plain concrete.

Most standard residential concreting (slabs, driveways, paths) does not require a permit. However, you may need approval for driveways crossing public land, retaining walls above a certain height, work affecting drainage, or structural concrete. Check with your local authority before starting work.

How We Get These Prices

This city page combines the local price entries already stored for Wellington with the broader New Zealand concreting dataset. We use those city rates where available and fall back to national pricing only when a specific service does not yet have a local entry.

Local sample size on this page: 4 service entries for Wellington.
We compare by service type so plain slabs, driveways, decorative finishes, retaining walls, and removal are not mixed into one meaningless average.
Rates are shown as ranges because access, excavation, reinforcement, drainage, and finish quality change the contract total materially.